Bayou Vista - Caneland
Bayou Vista - Caneland

CLIENT: Cleco Power  |   TYPE: Transmission  |   LOCATION: Bayou Vista, LA

Dec 2021 - Dec 2021

Assisted in pulling in new 954 ACSS conductor for approximately 3 miles.

Crews completed the scope of work with zero incidents, under the projected time frame and within budget, allowing the customer to get the project back on track.

Space-X
Space-X

CLIENT: Magic Valley Electric Cooperative (MVEC)  |   TYPE: Transmission and Distribution  |   LOCATION: Brownsville, TX

Jun 2021 - Apr 2021

Approximately 17-miles of double circuit line that will operate at 34.5kV, while being framed using 69kV insulators. This job consisted of pulling in bundle 559 AAAC primary, 4/0 AAAC neutral, and 1/0 AAAC under-build. This job called for digging holes up 36 inches in diameter and up to 17 feet deep. The terrain consisted of wetlands, as well as through a wildlife refuge. Job was completed with zero lost time incidents.

Raymondville
Raymondville

CLIENT: South Texas Electric Cooperative (STEC)  |   TYPE: Transmission  |   LOCATION: Raymondville, TX

Sept 2021 - March 2022

Approximately 11-miles of polymer brace post, concrete pole, single circuit 138kV transmission line, while transferring the existing shield wire and conductor to the new poles. This project required the use of 40-ton track crane, a dozer, drilling equipment capable of drilling up 42-inch diameter holes with depths up to 20 feet. This project also consisted of transferring energized distribution under-build from the old pole to the new concrete poles. Job was completed with zero incidents and ahead of schedule.

Bates to Liston Substation
Bates to Liston Substation

CLIENT: American Electric Power (AEP)  |   TYPE: Fiber  |   LOCATION: La Joya, TX

Oct 2021 - Dec 2021

Installation of 23.2 miles of 48ct ADSS on 185 steel transmission structures. Installed double dead ends on all structures along with slack loops and anchors and guys. This project went through neighborhoods and backyards where extra caution was taken by the crew to ensure the safety of the community. The project was completed on time and without out compromising safety.

Magruder to N. Victoria
Magruder to N. Victoria

CLIENT: American Electric Power (AEP)  |   TYPE: Fiber Optic  |   LOCATION: Victoria, TX

April 2022 - May 2022

Install 4 miles of 96ct ADSS from Magruder SS-N. Victoria on steel transmission structures. The work ran through congested areas the length of the line. All splicing and testing was completed to close out another successful project.